We lingered at the cafe for a little while before the recital, then on to the Courthouse for supper after the recital.
There is a little setback at the new cafe. This week, the boiler sprang a major leak, needs to be replaced. Without heat in the building, all work has come to a stop. A new one should be installed sometime this week. David said he 'didn't need this', but I told him to look on the bright side, if it was to happen, far better to 'go' before the move-in than after. At least they don't have to shut down the business.
The short video shows the mahogany stain and sealer on the upper raised seating area. This will be so rich looking.
1 comment:
The video looks good.
I love the look of the floors.
Post a Comment